Excavation permits and rules in Maryland
What the state requires before and during excavation work, with the page each rule comes from. It's a summary of the published rules, not legal advice, and a county or city can add rules of its own.
Checked September 19, 2026
Calling 811 before you dig
Licensing
Stormwater and erosion control
A stormwater permit is needed at 5,000 square feet or 100 cubic yards (state erosion and sediment control plan); 1 acre, or less if part of a larger common plan, for the construction general permit. Coverage is under the General Permit for Discharges from Stormwater Associated with Construction Activity, Maryland General Permit No. 20-CP.5, 6, 7
Sources
- Laws - Statute Text, Public Utilities 12-124 ↑
- Miss Utility of Maryland: Dig Safely with Locate Requests ↑
- Laws - Statute Text, Business Regulation 8-101 ↑
- Frequently Asked Questions (FAQs) - Do You Need a License to Do That? - Maryland Home Improvement Commission (MHIC) ↑
- General Permit for Stormwater Associated with Construction Activity ↑
- Construction Stormwater Permit 20-CP Frequently Asked Questions (FAQs) ↑
- Soil Erosion and Sediment Control ↑
What excavation costs in Maryland
Published national ranges for the common jobs, the regional adjustment for Maryland, and a planning estimate you can run for your own county.
Contractors in Maryland
560 excavation contractors are listed in Maryland. 452 hold an active USDOT registration. Browse them by county, or ask for quotes and we'll pass your job to contractors in your county.
Cite this page
“Excavation permits and rules in Maryland.” LeaderExcavation.com, updated September 19, 2026. https://leaderexcavation.com/md/rules/