LeaderExcavation.com

Excavation contractors in Transylvania County, NC

25 excavation contractors are registered in Transylvania County. All 25 hold an active USDOT registration. The largest town is Brevard.

North Carolina's Underground Utility Safety and Damage Prevention Act requires notice no less than three full working days before excavation or demolition begins.1 Grading work that costs $40,000 or more must be done by a licensed general contractor, and the state's licensing board offers a Grading and Excavating classification.2, 3 Land-disturbing activity of more than one acre needs an approved erosion and sedimentation control plan, filed at least 30 days before work starts,4 and disturbing one acre or more also requires coverage under the NCG01 construction stormwater permit.5

All 25 contractors

  1. Wilson Grading & Grounds
    Lake Toxaway5.0 from 3 reviews via Google
    (828) 966-3800
  2. Jerry McCall Grading
    Brevard4.0 from 7 reviews via Google
    (828) 553-4147
  3. (828) 883-3867
  4. (828) 884-6059
  5. (828) 966-4609
Map of excavation contractors in Transylvania County, NC
Pins mark ZIP code areas. A number shows how many contractors share that ZIP code.
  1. (828) 577-1654
  2. (828) 779-9887
  3. (828) 883-8036
  4. (828) 553-1093
  5. (828) 577-6340
  6. (828) 506-2572
  7. (828) 862-3823
  8. Hubbard Grading
    Pisgah Forest
    (828) 553-4649
  9. (828) 966-4002
  10. (828) 506-3232
  11. (973) 796-2292
  12. (828) 606-0974
  13. (828) 577-2676
  14. (828) 553-1370
  15. (828) 862-3726
  16. (828) 883-5522
  17. (828) 553-0781
  18. McGuire Grading
    Pisgah Forest
    (828) 883-3705
  19. (828) 885-7627
  20. (828) 458-8415

Ranked by verified owner, then Google rating, then fleet size. How ranking works

What excavation costs in North Carolina

Ranges are national; get three local quotes.

Residential excavation and site prep
$1,500–$5,000 for a typical job; $2,500–$15,000 for a full home sitePrice driver: Soil: clay and rock cost more than loam
Land clearing, small lot
$1,400–$5,800Price driver: Tree density
Grading a yard
$1,000–$5,000 for an average backyardPrice driver: Slope
Driveway excavation, before gravel or paving
$1,000–$5,000Price driver: Access: tight sites need smaller machines and more hours
Dirt haul-off
$500–$6,000 per jobPrice driver: Haul distance and disposal

Published labor data puts the Southeast's average rates lowest in the country.

Ranges compiled from HomeGuide, Angi, HomeAdvisor and contractor-published guides, checked September 2026.

Nearby counties

Sources

  1. 1.N.C.G.S. Chapter 87, Article 8A
  2. 2.N.C.G.S. § 87-1
  3. 3.NC Licensing Board for General Contractors
  4. 4.N.C.G.S. § 113A-57
  5. 5.NC Department of Environmental Quality